Basement Waterproofing Cost

1. Exterior waterproofing cost, starts at minimum of; $100 and maximum at $190 per linear foot.

2. Interior waterproofing cost, starts at minimum of; $70 and maximum of $100 per linear foot.

3. Sump pump installation cost, starts at minimum of; $550 and maximum of $1,700

4. Backwater valve installation cost starts at; $1,800 and can cost up to; $2,000 dollars.

↓↓↓ Scroll down to read more about details and additional expenses.

EXTERIOR WATERPROOFING COST - calculated per linear feet and depth of excavation

CALCULATED COST PER LINEAR FOOT CAN VARY BETWEEN
5 FT. DEPTH OR LESS
PER LINEAR FOOT

6 FT. DEPTH OR LESS
PER LINEAR FOOT

7 FT. DEPTH OR LESS
PER LINEAR FOOT

8 FT. DEPTH OR LESS
PER LINEAR FOOT

9 FT. DEPTH OR LESS
PER LINEAR FOOT

MINIMUM COST PER OCCURRENCE
SMALLEST ACCEPTABLE PROJECT COST

WINDOW WELL INSTALLATION COST CAN VARY BETWEEN: 100.00-200.00 CAD, AND IS CALCULATED IN ADDITION; TO THE WATERPROOFING COST, PER LINEAR FOOT
WINDOW WELL COST CAN VAR, THAT DEPENDS ON THE SIZE OF THE WINDOE, (width x depth x clearance size for the metal) THIS COST IS TO BE CALCULATED PER EACH WINDOW WELL, AND IT'S ADDED, ON TOP OF THE WATERPROOFING COST PER LINEAR FOOT. PLEASE NOTE!!! MINIMUM COST PER OCCURRENCE IS: 750.00 CAD

INTERIOR WATERPROOFING COST - calculated per linear feet and demo needed prior finished or unfinished basement

CALCULATED COST PER LINEAR FOOT CAN VARY BETWEEN
UNFINISHED BASEMENT
PER LINEAR FOOT

FINISHED BASEMENT
PER LINEAR FOOT

UNFINISHED UNDERPINNED BASEMENT
PER LINEAR FOOT

FINISHED UNDERPINNED BASEMENT
PER LINNEAR FOOT

MINIMUM COST PER OCCURRENCE
SMALLEST ACCEPTABLE PROJECT COST

SUMP PUMP INSTALLATION COST -price includes complete installation of; Liberty-Brand submersible sump pump, new pit with cover, check valve and discharge

INSTALLATION COST CAN VARY BETWEEN
SUMP PUMP REPLACEMENT INTO EXISTING PIT
IF SUMP PUMP IS EXISTING, AND ONLY THE PUMP IT SELF NEEDS TO BE REPLACED INTO THE EXISTING PIT AND CONNECTED TO THE EXISTING DISCHARGE, THEN THE COST IS ONLY 550 CAD, THAT INCLUDES SUPPLY AND INSTALL.

1/3hp LIBERTY-BRAND
"NO BATTERY BACKUP" STANDARD - A/C POWERED, INCLUDES: ABS - PIT, COVER, DISCHARGE AND CHECK VALVE

1/2hp LIBERTY-BRAND
"NO BATTERY BACKUP" STANDARD - A/C POWERED, INCLUDES: ABS - PIT, COVER, DISCHARGE AND CHECK VALVE

1/3hp LIBERTY-BRAND
"WITH BATTERY BACKUP" STANDARD - A/C POWERED, INCLUDES: ABS - PIT, COVER, DISCHARGE AND CHECK VALVE

1/2hp LIBERTY-BRAND
"WITH BATTERY BACKUP" STANDARD - A/C POWERED, INCLUDES: ABS - PIT, COVER, DISCHARGE AND CHECK VALVE

ADDITIONAL VARIABLE COST CAN OCCUR IF; OUTSIDE EXCAVATION IS REQUIRED
THIS MAY BE NEEDED ONLY IF; MAKING A NEW CONNECTION FROM EXTERIOR WEEPING TILE TO NEW SUMP PIT, (this cost can vary prior the depth of the excavation)

BACKWATER VALVE INSTALLATION -main sanitary drain back flow protection from sewer backups

INSTALLATION COST CAN VARY BETWEEN
INTERIOR BACKWATER VALVE
INSTALLED INSIDE THE BASEMENT AT FRONT FOUNDATION WALL, (includes permit and inspection with City of Toronto)

EXTERIOR BACKWATER VALVE
INSTALLED OUTSIDE IN FRONT LAWN ON PRIVATE PROPERTY, (includes permit and inspection with City of Toronto)

ADDITIONAL COST WHEN INSTALLING A BACKWATER VALVE, CAN OCCUR ONLY IF; INSTALLING A EXTERIOR VALVE, AND THE EXCAVATION DEPTH IS 8FT. DEEP OR MORE
THIS COST IS CALCULATED PER THE DEPTH OF THE EXCAVATION, FOR EXAMPLE; IF IT'S NEEDED TO DIGG DOWN TO 8 ft. OR 9ft. DEPTH, ADDITIONAL VARIABLE COST OF: 500 CAD, CAN OCCUR.

OTHER ADDITIONAL CHARGES MIGHT APPLY -if need to disassemble, demo, remove certain items

A/C UNIT TO REMOVE AND REINSTALL
MIGHT BE REQUIRED IF; EXTERIOR WATERPROOFING IS DONE, THIS INCLUDES THE A/C - UNIT TO BE REMOVED AND REINSTALLED, (included recharging with coolant prior reinstallation)

REMOVAL AND DISPOSAL OF; DECK OR PORCH
RARELY BUT; MIGHT BE REQUIRED IF: EXTERIOR EXCAVATION IS DONE. (cost can vary, prior; size of the structure and materials is build from)

DEMOLITION, REMOVAL AND DISPOSAL OF; CONCRETE OR ASPHALT
MIGHT BE REQUIRED IF; EXTERIOR EXCAVATION IS DONE, (cost can vary prior the square footage size and the thickness of the material)

OUR COMMITMENT TO HOME OWNERS

ARANGE PERMITS AND INSPECTION WITH THE CITY OF TORONTO

CALL FOR LOCATES PRIOR EXCAVATION

PROVIDE YOU WITH, OR HELP YOU FILL UP THE SUBSIDY FORMS - TO RECEIVE CITY REBATES

FREE ESTIMATES

WRITTEN CONTRACT

INVOICE/RECEIPT WITH CALCULATED TAX

25 YEARS WARRANTY CERTIFFICATE

PROPER WORKMAN LIKE MANNER

SUMP PUMP - CITY REBATES

$1,750.00

BACKWATER VALVE - CITY REBATES

$1,250.00

DOWNSPOUT - CITY REBATES

$400.00
basement waterproofing Toronto
Interior basement waterproofing
foundation crack repair
Foundation crack repair
Exterior Waterproofing Toronto
Exterior Waterproofing Toronto